Description: This code applies to all buildings except detached one- and two-family dwellings and townhouses up to three stories. The 2021 IBC® contains many important changes such as:Puzzle rooms (escape rooms) are now defined and regulated as special amusement areas, requiring compliance with Section 411 and special means of egress requirements.For the purposes of determining the allowable number of control areas in a building, each portion separated by one or more fire walls is now considered as a separate building.In Group E occupancies, enhanced classroom acoustics in compliance with ICC A117.1 are to be provided in all classrooms having of volume of 20,000 cubic feet or less.The requirements for metal composite materials and systems (MCM) installed on the exterior walls of Types I, II, III and IV construction were simplified and sprinkler allowances were deletedThe use of intermodal shipping containers as buildings is now specifically addressed through provisions intended to supplement existing applicable IBC requirements.Automatic sprinkler protection is now required in Group S-2 open parking garages where any fire area exceeds 48,000 square feet.The 2017 edition of ICC A117.1 was adopted.Parapets of a minimum height are now required for aggregate-surfaced roofs to prevent blow-off.Mixed occupancy buildings with assembly spaces are placed in Risk Category III when the total public assembly occupant load is greater than 2500 people.The 2021 IBC snow map is updated to match ASCE 7-16 snow maps by adding a reference to ASCE 7 snow tables in states with large case study areas.Secondary rain loads are updated to be consistent with ASCE 7.Special inspection requirements were added to address the anchorage and connection of mass timber structural elements.Installation of firestop, fire-resistant joint systems and perimeter fire barrier systems in residential-use buildings now requires special inspection in Group R fire areas having an occupant load exceeding 250 people.Frost protection for egress doors was added to the foundation requirements.ACI standards ACI 117 and ITG 7 were added by reference to provide acceptable tolerances for concrete construction.Three new types of construction (Types IV-A, IV-B, and IV-C) allow mass timber buildings of taller heights, more stories above grade, and greater allowable areas compared to existing provisions for heavy timber buildings.
Price: 182.5 USD
Location: Stanton, California
End Time: 2024-11-17T07:12:35.000Z
Shipping Cost: 4.95 USD
Product Images
Item Specifics
Restocking Fee: No
Return shipping will be paid by: Buyer
All returns accepted: Returns Accepted
Item must be returned within: 30 Days
Refund will be given as: Money Back
Subject Area: Civil Engineering
Educational Level: Adult & Further Education
Level: Technical, Advanced
Subject: Engineering & Technology
Author: International Code Council
Publication Name: 2021 International Building Code
Format: Trade Paperback
Language: English
Publisher: International Code Council
Publication Year: 2020
Series: International Code Council Ser.
Type: Textbook
Item Weight: 70.5 Oz